Bills of materials
Define the recipe for each product: raw materials, quantities, operations and scrap.
Plan availability
Available with the Production add-on, which any plan can add. Contact us to add it.
Overview
A Bill of Materials (BOM) lists everything needed to make a quantity of a product, and optionally the operations it passes through. A work order uses it to know what to consume.
Prerequisites
Items created for the product and each ingredient, with their units of measure.
Steps
- Search for BOM and click Add BOM.
- Choose the Item you are making, and the Quantity the BOM produces (for example 10 loaves).
- In the Items table, add each raw material, with its Quantity and UOM. Choose the Source Warehouse if you want a default.
- If your process has steps, tick With Operations and add the Operations table: the operation, the Workstation, and the time in minutes.
- Add scrap items under Scrap Items, if any.
- Click Save, then Submit.
- Tick Is Default and Is Active so the system chooses it for work orders.
Sub-assemblies
If a raw material is itself made in-house, give that item its own BOM and tick Allow Alternative Item or choose BOM No in the row. The system can then plan it too.
Cost
Click Update Cost to refresh the BOM cost from current purchase and valuation rates. The Raw Material Cost and the total appear on the form.
Practical example
A BOM for 10 loaves lists 5 kg flour, 0.2 kg yeast, 0.1 kg salt and 3 litres of water. The cost of ingredients per loaf is clear before any dough is made.
Important notes
- Submit a new version of a BOM instead of editing a used one. Mark the old one inactive.
- Include waste in the quantities, or record it as scrap.
- Quantities and UOM errors are the most common cause of wrong costs.
Common mistakes
- Two active default BOMs for one item.
- Forgetting to submit the BOM, so it cannot be used.