Documentation/Manufacturing/Work orders and production

Work orders and production

Create a work order, move materials, record production and receive finished goods.

IntermediateAbout 30 minutesVersion 1.0Updated 17 November 2026

Plan availability

Available with the Production add-on, which any plan can add. Contact us to add it.

Overview

A Work Order tells production to make a quantity of an item using a BOM. It tracks the materials issued and the goods produced.

Prerequisites

A submitted default BOM, enough raw material in stock, and the Source, Work-in-Progress and Target warehouses.

Steps

Create the work order

  1. Search for Work Order and click Add Work Order.
  2. Choose the Item To Manufacture. The default BOM fills in.
  3. Enter the Quantity to Manufacture, and the Planned Start Date.
  4. Choose the Source Warehouse (raw materials), Work-in-Progress Warehouse and Target Warehouse (finished goods).
  5. Save and Submit.

Start production

  1. Click Start. Hesabu ERP creates a Stock Entry of type Material Transfer for Manufacture.
  2. Check the quantities, and submit. Raw materials move to the work-in-progress warehouse.

Record the finished goods

  1. When production is done, click Finish.
  2. A Stock Entry of type Manufacture opens, with raw materials consumed and finished goods received. Adjust the quantity if only part was made.
  3. Submit. Finished goods enter the target warehouse, and the work order shows the Produced Qty.

If something goes wrong

  • To stop, click Stop. To resume, Re-open.
  • If you transferred the wrong materials, return them with a stock entry. See Warehouses and stock entries.

Practical example

The bakery makes 200 loaves. The baker raises a work order using the bread BOM, transfers the flour, yeast and salt, bakes, and records 196 loaves produced and 4 spoiled in the Manufacture entry.

Important notes

  • Work orders do not start if stock is insufficient. Buy first, or reduce the quantity.
  • Only submitted work orders affect stock.
  • Keep the time between Start and Finish short, so work in progress does not hide stock.

Common mistakes

  • Finishing a work order for more than was physically made.
  • Not completing, so raw materials stay stuck in work in progress.

Next steps

Read Job cards and production planning.

Was this article helpful?