Quality inspections
Define what to check on an item and record inspection results on receipts, deliveries and production.
Plan availability
Available with the Production add-on, which any plan can add. Contact us to add it.
Overview
A Quality Inspection records the result of checking goods against a specification, for example the moisture of grain you receive or the finish on a product before delivery. It can be required before a document is submitted.
Prerequisites
Items created. Decide what to check and the acceptable range for each reading.
Steps
Create an inspection template
- Search for Quality Inspection Template and click Add.
- Enter a name, such as Grain Intake.
- Search for Quality Inspection Parameter first and add each parameter you check, such as Moisture or Weight.
- In the template, add the parameters, with the Acceptance Criteria: either a numeric range (Minimum Value and Maximum Value), or an Acceptance Criteria Value or Formula.
- Save.
Require it on an item
- Open the Item, and find the Quality Inspection section.
- Tick Inspection Required before Purchase and/or before Delivery, and choose the Quality Inspection Template.
- Save.
Record an inspection
- From a Purchase Receipt, Delivery Note or Stock Entry, click Create > Quality Inspection. You can also add one from Quality Inspection directly.
- Choose the Inspection Type (Incoming, Outgoing or In Process), the Item, the Sample Size and the Inspected By.
- The template's parameters fill in. Enter each Reading Value and mark it Accepted or Rejected.
- Save and Submit. The overall Status is Accepted if all readings pass, or Rejected if not.
Practical example
A mill checks each delivery of maize. Moisture must be at most 13.5%. A lorry's sample reads 15.1%, so the inspection is rejected, and the receipt is held. The purchasing manager contacts the supplier.
Important notes
- If an inspection is required and not done, the system can stop the document from being submitted. Check the setting in Stock Settings.
- Record readings honestly. The inspection history is your evidence in a dispute with a supplier.
- Return rejected goods with a Purchase Return. See Purchase returns and debit notes.
Common mistakes
- A range that is too tight, so everything fails.
- Inspecting after the goods have been issued.
Next steps
Read Quality management.